Sorry, this page has moved!
Please click here to go to the new location.
Archived Bids 2010-11
Due Date
Time
Location
BID Number Title
Description
Results
06/21/2011
3:00 PM
CITY CLERK'S OFFICE
10-11.027

14901 EAST 14TH STREET DEMOLITION

The work to be done consists of hazardous material abatement, demolition and removal of the building, and doing all appurtenant work in place and ready for use.

ADDENDUM #1
Click for Results
06/13/2011
3:00 PM
CITY CLERK'S OFFICE
10-11.008

TOYON PARK RESTROOM REPLACEMENT SITEWORK

The work to be done consists of the removal of an existing restroom building, installation of new accessible parking stall, site preparation for placement of a pre-fabricated restroom structure, and doing all appurtenant work in place and ready for use.

ADDENDUM 1
Click for Results
06/02/2011
3:00 PM
CITY CLERK'S OFFICE
10-11.022

MARINA BOULEVARD STREET REHABILITATION

The work to be done consists of reconstructing Marina Blvd from San Leandro Blvd to Washington Ave through full-depth rehabilitation, milling and replacing 4” AC on Marina Blvd from Teagarden St to Alvarado Street and doing all appurtenant work in place and ready for use.

ADDENDUM #1
SHEET # 9 - REVISED STREET STRIPING PLAN
SHEET #14 - HERON BAY IMPROVEMENTS

Click for Results
05/17/2011
3:00 PM
CITY CLERK'S OFFICE, 2ND FLOOR, CITY HALL, 835 E. 14TH ST., SAN LEANDRO, CA
09-10.021

STREET LIGHT UNDERGROUNDING - EAST 14TH STREET

The work to be done consists of removing and replacing street light foundations and poles, installing conductors, installing a new service point, and doing all appurtenant work in place and ready for use.

Click for Results
05/12/2011
3:00 PM
CITY CLERK'S OFFICE
10-11.024

ANNUAL STREET SEALING 2010-11

The work to be done consists of applying asphalt rubber chip seal, slurry seal, or microsurfacing on City streets, and doing all appurtenant work in place and ready for use.

NO PRE-BID MEETING IS SCHEDULED

Click for Results
05/11/2011
3:00 PM
CITY CLERK'S OFFICE
10-11.020

2660 EDEN ROAD REMEDIATION

The work to be done consists of excavation and backfill, waste profiling and confirmation sampling, and disposal of contaminated dirt, and doing all appurtenant work in place and ready for use.

Addendum 1
Click for Results
05/05/2011
3:00 PM
CITY CLERK'S OFFICE
10-11.016

ROOF REPLACEMENT AND ACCESSORIES (YEAR 3)

The work to be done consists of asbestos and lead abatement, removal and disposal of existing roof down to the deck; installing a new roofing system at 999 East 14th Street, and doing all appurtenant work in place and ready for use.

ADDENDUM #3

ADDENDUM 1
ADDENDUM 2
CLICK HERE FOR DRAWINGS THAT ACCOMPANY ADDENDUM NO. 2
Click for Results
05/03/2011
3:00 PM
CITY CLERK'S OFFICE
10-11.021

PREDA STREET PIPE BRIDGES UPGRADE

The work to be done consists of: augmenting structural steel members to two parallel sanitary sewer pipe bridge trusses; upgrading connections to the existing abutments; replacing approximately 100-linear feet each of 20” and 18” pipe with flanged connections and flexible connections; constructing & installing wing walls; removing vegetation; bank excavation; replacement of removed vegetation; maintaining sewer service throughout the construction period; and doing all appurtenant work in place and ready for use.

DRAWING 1 TO ACCOMPANY PREDA ST. PIPE BRIDGE PROJECT

DRAWING 2 TO ACCOMPANY PREDA ST. PIPE BRIDGE PROJECT

DRAWING 3 TO ACCOMPANY PREDA ST. PRIPE BRIDGE PROJECT

DRAWING 4 TO ACCOMPANY PREDA ST. PIPE BRIDGE PROJECT

DRAWING 5 TO ACCOMPANY PREDA ST. PIPE BRIDGE PROJECT

DRAWING 6 TO ACCOMPANY PREDA ST. PIPE BRIDGE PROJECT

DRAWING 7 TO ACCOMPANY PREDA ST. PIPE BRIDGE PROJECT

ADDENDUM 1
Click here for attachment to Addendum 1 - Temporary Flow Monitoring Study
Click here for attachment to Addendum 1 - Geotechnical Engineering Investigation, June 2008
Click for Results
04/28/2011
3:00 PM
PURCHASING
10-11.025

BIOSOLIDS PROCESSING

The City of San Leandro (City) is seeking bids from qualified vendors for Biosolids Processing (drying biosolids via aeration using a low ground pressure windrow turner) at our Water Pollution Control Plant beginning in May and running through October of 2011, approximately 16-24 hours per week and for a estimated total of 520 hours for the project. 

Click for Results
04/19/2011
3:00 PM
CITY CLERK'S OFFICE
10-11.006

San Leandro Blvd (SLB)/Davis St. Sewer Capacity Improvements - Phase I

The work to be done consists of installing an 18” sanitary line, installing new manholes, grouting lines to be abandoned in place, and doing all appurtenant work in place and ready for use.

ADDENDUM #1
Click for Results
04/13/2011
3:00 PM
CITY CLERK'S OFFICE
10-11.017

WATER POLLUTION CONTROL PLANT REHABILITATION

The work to be done includes, but not limited to, demolition of existing facilities, new headworks and influent pump station, new grit facility, primary clarifier nos. 1 and 2 improvements, new primary clarifier no. 3, new fixed-film reactor, new biofilter odor control facilities, secondary clarifier nos. 1 and 2 improvements, equalization tank nos. 1 to 3 improvements, new equalization basin, digester nos. 1 and 2 improvements, administration control building (Bid Alternative A), civil and yard facilities improvements, landscaping improvements, electrical system improvements, instrumentation and control system improvements, and doing all appurtenant work in place and ready for use. 

ADDENDUM #2 and the supporting documents for it as well as the Geotechnical Report and Plant As-built drawings can be downloaded at the San Leandro ftp site:  ftp://ftp.ci.san-leandro.ca.us/  you will need to use the following for your login and password once at the site:
login: wpcp           password: slwpcp 

CLICK HERE FOR ADDENDUM #3

CLICK HERE FOR DRAWINGS TO ACCOMPANY ADDENDUM #3

CLICK HERE FOR ADDENDUM #4

CLICK HERE FOR DRAWINGS TO ACCOMPANY ADDENDUM #4

CLICK HERE FOR ADDENDUM #5

CLICK HERE FOR ADDENDUM #6

CLICK HERE FOR ADDENDUM #7

PRE-BID CONFERENCE SIGN-IN SHEET
ADDENDUM NUMBER 1
ATTACHMENTS FOR ADDENDUM NUMBER 1
Click for Results
04/12/2011
3:00 PM
CITY CLERK'S OFFICE
10-11.007

SAN LEANDRO DOG WALKING PARK

 The work to be done consists of fencing and site furnishings for a dog walking area, and doing all appurtenant work in place and ready for use.

Click for Results
03/23/2011
3:00 PM
PURCHASING
10-11.019

PANASONIC TOUGHBOOK LAPTOP COMPUTERS & ACCESSORIES

The City of San Leandro has standardized on the Panasonic Toughbook and accessories for use in our Police Vehicles.   This Invitation for Bids is to provide new, current model COMPUTERS, ACCESSORIES AND WARRANTIES per the specifications and quantities listed on the bid sheet(s).

Bidder must be a “Panasonic Toughbook Partner” to submit a bid.

Click for Results
02/24/2011
3:00 PM
PURCHASING DEPARTMENT
10-11.018

LED STREET LIGHT FIXTURES

Provide 70 Watt LED Street Light Fixtures in accordance with the specifications of the bid and which meet the rebate specifications of PG&E

ADDENDUM #1
Click for Results
01/14/2011
3:00 PM
Purchasing Department
10-11.015

HVAC REPLACEMENT AT SOUTH OFFICES

HVAC replacement at City Hall South Offices, to include removal and disposal of two existing A/C package units and provide and install four (4) new high-efficiency rooftop gas pack units of similar design and one (1) ductless split system heat pump with two evaporative coils.

 

ADDENUM #1 NEW DUE DATE 01/14/2011
PRE BID SIGN IN SHEET
015 MECHANICAL DRAWING
Click for Results
01/04/2011
3:00 PM
CITY CLERK'S OFFICE
Click here

NOTICE OF PRE-QUALIFICATON FOR WPCP REHAB PROJECT

Notice is hereby given that the City of San Leandro has determined that all bidders for the Instrumentation and Process Control component on the WPCP Rehabilitation Project, Project No. 08-593-52-239, must be pre-qualified prior to submitting a bid on this project.  It is mandatory that all Instrumentation and Process Control contractors who intend to submit a bid, fully complete the pre-qualification questionnaire, provide all materials requested herein, and be approved by the City of San Leandro to be on the final qualified Bidders list for the Instruction and Process Control portion of the work. 

click here for the RFQ questionnaire
Not yet available
12/15/2010
3:00 PM
PURCHASING DEPARTMENT
10-11.011

THREE (3) POLICE PATROL VEHICLES (BLACK & WHITE)

Provide three (3) current model year police patrol vehicles per attached specifications


CORRECTION NOTE: PAGE 3 BID HEADING - SPECIFICATIONS SHOULD READ THREE (3) EACH NOT 2 AND BID NUMBER SHOULD BE 10-11.011

Click for Results
12/15/2010
3:00 PM
PURCHASING DEPARTMENT
10-11.012

ONE (1) POLICE PATROL VEHICLE - METALLIC SILVER

Provide one (1) current model year police patrol vehicle per the attached specifications

CORRECTION NOTE: ON PAGE 3 DESCRIPTION "SPECIFICATION" BID NUMBER SHOULD BE 10-11.012

Click for Results
12/15/2010
3:00 PM
PURCHASING DEPARTMENT
10-11.013

ONE (1) POLICE PATROL VEHICLE - METALLIC DARK BLUE

Provide one (1) current model year police patrol vehicle per the attached specifications

CORRECTION NOTE: ON PAGE 3 HEADING "SPECIFICATIONS" BID NUMBER SHOULD READ 10-11.013

Click for Results
12/15/2010
3:00 PM
PURCHASING DEPARTMENT
10-11.014

ONE (1) THREE QUARTER (3/4) TON PICKUP TRUCK

Provide one (1) current model year three quarter (3/4) ton pickup truck

Click for Results
10/21/2010
3:00 PM
Purchasing
10-11.010

2009-2010 Sludge Haul

All labor, materials and equipment, and performing all work necessary and incidental to dispose of approximately 1200 tons of Class A municipal biosolids.  Pending analytical analysis, it is likely an additional 1200 tons of Class A municipal biosolids may need to be hauled, but this cannot be guaranteed.

Biosolids Annual Report 2009

Pre-Bid Conference Attendance List 10/7/2010

Click for Results
10/06/2010
3:00 PM
PURCHASING OFFICE
10-11.009

BUILDING MANAGEMENT SYSTEM PROJECT

Provide and install a Building Management System (HVAC and/or Lighting) in multiple City buildings per bid specifications.


Pre-Bid Conference Sign In Sheet 9/22/2010

Click for Results
09/22/2010
3:00 PM
CITY CLERK'S OFFICE
09-10.001

E. 14TH ST. STRIPING AND PEDESTRIAN IMPROVEMENTS

The work to be done consists of removing and replacing traffic stripes, pavement markings and markers; installing traffic detector loops; and doing all appurtenant work in place and ready for use.

Click for Results
08/25/2010
3:00 PM
CITY CLERK
10-11.005

ESTUDILLO CALLAN 2008 PARKING GARAGE

Demolition and removal of a 2-3 story parking garage structure; construction of a new 4-5 story parking garage with office space on first level; demolition and reconstruction of an adjacent 6,500 sq.ft. courtyard; modification of an adjacent surface parking lot, minor asbestos abatement

ADDENDUM 4

ADDENDUM 3

ADDENDUM 3 EXHIBITS (NOTE THIS IS A ZIP FILE)

10-11.005 ADDENDUM #1
ADDENDUM #2
Additional Addendum #2 Information
Click for Results
08/19/2010
11:00 AM
City Clerk
10-11.001

2660 EDEN ROAD GRADING AND DIRT DISPOSAL

The work to be done consists of clear and grubbing, grading, excavation, segregation of material, stockpiling, hauling, disposal of soil and miscellaneous debris, and doing all appurtenant work in place and ready for use, all as shown on the plans and described in the specifications with the title indicated in Paragraph 1 above, and on file in the office of the Engineer. Reference to said plans and specifications is hereby made for further particulars

ADDENDUM NUMBER 1

2660 Eden Soil Char Report March 2006 by ACC Environmental
2660 Eden Additional Soil Char Report October 2006 by ACC Environmental
2660 Eden Soil Quality Evaluation Report August 2008 by Cornerstone
Click for Results
07/13/2010
3:00 PM
City Clerk
09-10.026

2009 SANITARY SEWER PIPELINE REPLACEMENT PROJECT

The work to be done consists of furnishing all labor, materials, tools, equipment and supervision to directional drill, excavate, expose and replace/repair/CIPP, defective sanitary sewer mains and manholes at various locations throughout the City, and doing all appurtenant work (including, but not limited to: public notification; traffic control; traffic loop replacement; utility locating; sheeting/shoring/bracing; flow bypass; pipeline cleaning, pre-televising sewer mains and lateral locating as needed, surface restoration; and post-repair video) in place and ready for use.

09-10.026 ADDENDUM #1 BID SUSPENDED
09-10.026 ADDENDUM #2 WITH EXHIBITS A, B & C
09-10.026 ADDENDUM #3
Click for Results
07/08/2010
3:00 PM
City Clerk
09-10.030

PARK PATHWAYS (WW)

Removal and replacement of park pathways in six city parks.

Click for Results
07/08/2010
2:00 PM
City Clerk
09-10.029

ANNUAL STREET SEALING 2009-10

The work to be done consists of applying asphalt rubber chip seal and/or slurry seal on City streets, and doing all appurtenant work in place and ready for use. 
NOTE: No Pre-Bid Meeting is scheduled. 

ADDENDUM 1 BID NO. 09-10.029
ADDENDUM 1 EXHIBITS A, B, C AND D
Click for Results
07/07/2010
11:00 AM
CITY CLERK
09-10.028

BANCROFT AVENUE STREET REHABILITATION

The work to be done consists of reconstructing Bancroft Ave from 138th to 148th Ave through full-depth rehabilitation.

Addendum 1
Certified Data Report for Addendum 1
Click for Results
07/06/2010
11:00 AM
City Clerk
10-11.002

ANNUAL SIDEWALK PROGRAM 2010-11

The work to be done consists of removal and replacement of concrete sidewalk, curb, gutter, and doing all appurtenant work in place and ready for use.

Click for Results