06/29/2012 3:00 PM CITY CLERK'S OFFICE | 11-12.018 | ASPHALT RUBBER STREET SEALING 2011-12 The work to be done consists of applying asphalt rubber chip seal, slurry seal, or microsurfacing on City streets, and doing all appurtenant work in place and ready for use. |
Click for Results
|
06/28/2012 3:00 PM CITY CLERK'S OFFICE | 11-12.011 | ANNUAL STREET SEALING 2011-12 The work to be done consists of applying slurry seal and scrub seal on City streets, and doing all appurtenant work in place and ready for use. |
Click for Results
|
04/16/2012 2:00 PM BAY AREA CHEMICAL CONSOTIUM | BACC BID 01-2012 | BACC CHEMICAL BID - SODIUM HYPOCHLORITE The Bay Area Chemical Consortium (BACC), a cooperative group of public agencies, is seeking competitive sealed bids for the supply and delivery of 12.5% sodium hypochlorite. Bids are to be prepared pursuant to the specifications provided by Dublin San Ramon Services District (DSRSD), the coordinating Agency for this bid. All sealed bids to be considered for acceptance must be received by 9:00 A.M. PDT, Monday, April 16, 2012 at the Dublin San Ramon Services District Regional Wastewater Treatment Facility at 7399 Johnson Drive, Pleasanton, CA 94588. Bids received after said date and time will be returned to the sender unopened, and will not be considered under any circumstances. Bids postmarked but received after the bid opening will not be accepted. Bids submitted electronically or by facsimile will not be accepted. The bids will be publicly opened and read aloud to all in attendance at 9:00 A.M. PDT on Monday, April 16, 2012. Bidders are invited, but not required, to attend the bid opening.
BACC and its member Agencies reserves the right to reject any and all bids and to waive informalities, irregularities or technical defect in the bids received.
For additional information or any questions concerning this bid, please contact Louanne Ivy, Administrative Analyst, at Dublin San Ramon Services District, 7399 Johnson Drive, Pleasanton, CA 94588, or telephone (925) 875-2398. The fax number is (925) 462-0658 and the email address is ivy@dsrsd.com.
Addendum #1 - Contact Dublin San Ramon Svc. Dist. |
Not yet available
|
04/16/2012 2:00 PM BAY AREA CHEMICAL CONSORTIUM | BACC BID 08-2012 | BACC CHEMICAL BID, WATER & WASTEWATER TREATMENT POLYMERS The Bay Area Chemical Consortium (BACC), a cooperative group of public agencies, is seeking competitive sealed bids for the supply and delivery of water and wastewater treatment polymers. Bids are to be prepared pursuant to the specifications provided by Dublin San Ramon Services District (DSRSD), the coordinating Agency for this bid. All sealed bids to be considered for acceptance must be received by 2:00 P.M. PDT, Monday, April 16, 2012 at the Dublin San Ramon Services District Regional Wastewater Treatment Facility at 7399 Johnson Drive, Pleasanton, CA 94588. Bids received after said date and time will be returned to the sender unopened, and will not be considered under any circumstances. Bids postmarked but received after the bid opening will not be accepted. Bids submitted electronically or by facsimile will not be accepted. The bids will be publicly opened and read aloud to all in attendance at 2:00 P.M. PDT on Monday, April 16, 2012. Bidders are invited, but not required, to attend the bid opening.
BACC and its member Agencies reserves the right to reject any and all bids and to waive informalities, irregularities or technical defect in the bids received.
For additional information or any questions concerning this bid, please contact Louanne Ivy, Administrative Analyst, at Dublin San Ramon Services District, 7399 Johnson Drive, Pleasanton, CA 94588, or telephone (925) 875-2398. The fax number is (925) 462-0658 and the email address is ivy@dsrsd.com. Addendum #1 - Contact Dublin San Ramon Svc. Dist. |
Not yet available
|
04/04/2012 4:00 PM PURCHASING DEPARTMENT | 11-12.007 | CITY-WIDE STREET RE-STRIPING 2011-12 All labor, materials, equipment, supplies and supervision required to perform the following: Refresh existing striping on the City of San Leandro streets per the attached lists, maps and specifications. |
Click for Results
|
03/29/2012 3:00 PM PURCHASING DEPARTMENT | 11-12.015 | BOULEVARD YARWOOD TREE TRIMMING 2012 Furnishing all labor, materials and equipment, and performing all work necessary and incidental to trim a stand of Yarwood Sycamore Trees located along local boulevards and adjacent roadways throughout the City of San Leandro in accordance with the City of San Leandro plans, specifications and contract documents. PRE-BID CONFERENCE SIGN-IN SHEET |
Click for Results
|
03/28/2012 3:00 PM PURCHASING DEPARTMENT | 11-12.013 | REPAIR/REPLACE APPROX 908 SF OF STUCCO AT CITY HALL REPAIR/REPLACE APPROXIMATELY 908 SF OF STUCCO AT CITY HALL. ON WEST WALL TO INCLUDE REPLACEMENT OF 4 WINDOWS AND REPAIRS TO THE WINDOW FRAMES PRE-BID CONFERENCE SIGN IN SHEET 0/14/2012 |
Click for Results
|
02/23/2012 3:00 PM PURCHASING DEPARTMENT | 11-12.014 | PANASONIC LAPTOP COMPUTERS AND ACCESSORIES This Invitation for Bids is to provide new, current model COMPUTERS, ACCESSORIES AND WARRANTIES per the attached specifications and quantities listed on the attached bid sheet(s). Bidder must be a “Panasonic Toughbook Partner” to submit a bid. ADDENDUM #1 |
Click for Results
|
01/11/2012 3:00 PM CITY CLERK | 11-12.008 | BANCROFT AVE AND 136TH AVE TRAFFIC LIGHT PROJECT The work to be done consists of traffic signal installation, fiber optic interconnect, removal and replacement of curb ramps, pavement striping, and doing all appurtenant work in place and ready for use. Pre-Bid Conference Sign-In Sheet Addendum 1 |
Click for Results
|
12/16/2011 3:00 PM PURCHASING DEPARTMENT | 11-12.010 | ONE (1) EACH TRAILER MOUNTED MELTER/APPLICATOR Provide one (1) Current Model Year Trailer Mounted Melter/Applicator asphalt joint/crack sealing unit. |
Click for Results
|
11/17/2011 3:00 PM PURCHASING | 11-12.009 | SLUDGE HAUL 2011-12 Furnishing all labor, materials and equipment, and performing all work necessary and incidental to dispose of approximately 1200 tons of Class A municipal biosolids. |
Click for Results
|
09/27/2011 3:00 PM Purchasing Department | 11-12.005 | FURNISH AND INSTALL FENCE AT PD PARKING LOT Furnish and install fence with two man gates and one rolling gate at Police Department parking lot at San Leandro City Hall ADDENDUM #1 |
Click for Results
|
09/14/2011 3:00 PM Purchasing Department | 11-12.006 | Seven (7) Current Model Year Police Patrol Vehicles Provide seven (7) current model year police patrol vehicles (PPV's) in accordance with City specification ABW 070111-1104 ADDENDUM #1 |
Click for Results
|
08/25/2011 3:00 PM City Clerk's Office | 11-12.001 | 14901 East 14th Street Remediation NOTE: DUE DATE CHANGED TO AUGUST 25, 2011, 3:00 PM LOCAL TIME
The work to be done consists of excavation and backfill, disposal of contaminated soil, and doing all appurtenant work in place and ready for use.
Remedial Action Plan
Addendum #1
Addendum #2
Addendum #3
Pre-Bid Conference Sign-In Sheet 7/5/2011 |
Click for Results
|
08/17/2011 3:00 PM CITY CLERK'S OFFICE | 11-12.003 | ANNUAL SIDEWALK PROGRAM 2011-12 IFB The work to be done consists of removal and replacement of concrete sidewalk, curb, gutter and all appertunenant work in place and ready for use |
Click for Results
|
08/15/2011 3:00 PM City Clerk's Office | 11-12.004 | ADA Ramp Project 11-12 The work to be done consists of removal and replacement of concrete sidewalk, curb, gutter, handicap ramps citywide and the installation of pedestrian actuated push buttons at selected large intersections and doing all appurtenant work in place and ready for use.
ADDENDUM #1 WITH DRAWING
|
Click for Results
|
07/08/2011 3:00 PM City Clerk's Office | 10-11.023 | Annual Overlay/Rehabilitation 2010-11 The work to be done consists of reconstructing various streets through full-depth rehabilitation, which includes the removal of asphalt concrete (AC), cement stabilization of the road base, and application of a surface AC layer and doing all appurtenant work in place and ready for use. |
Click for Results
|
07/01/2011 11:00 AM CITY CLERK'S OFFICE | 10-11.026 | MARINA PARK PAR COURSE IMPROVEMENTS The work to be done consists of providing pedestrian control and construction area signs, referencing, obtaining staging and stockpiling location and phasing work, root pruning, installation of exercise equipment stations, site grading, grinding of existing pathway, placement of headerboard and AC replacement, and doing all appurtenant work in place and ready for use. |
Click for Results
|